exps.txt 1.5 KB

12345678910111213141516171819202122232425262728
  1. E000 -- standard run as coming from the ecearth_patch
  2. 3.3.0, rev 6607, from scratch, standard output [SUCCESS]
  3. E001 -- with new output, constant forcing [SUCCESS]
  4. E002 -- Trying 4 legs in two runs [SUCCESS]
  5. E003 -- 10 days restarting from existing exp (E002) on
  6. Jan 1 1993. Reproducibility check. [SUCCESS]
  7. E004 -- Same as E003 but using David Docquier's NEMO
  8. restarts in Jan 1993 instead of E002's,
  9. by overriding
  10. these restarts (only feasible option, as
  11. ece-ifs+nemo.sh copies all contents of the
  12. run directory of the mother experiment to branch
  13. from, and DD's version and mine differ) [SUCCESS]
  14. E005 -- Restarting from E002 in Jan 1 1991
  15. but using NEMO restarts
  16. from year 150 of DD's runs, that were tweaked [SUCCESS]
  17. IC90 -- Starting from Jan 1 1990, running 1 year, saving
  18. restarts on 19901231 to use atmosphere (and
  19. possibly ocean/ice) ICs for other runs [SUCCESS]
  20. E006 Control run
  21. Report from telecons
  22. --------------------
  23. 6 March 2019
  24. - Bug in soil carbon pools when going from historical to scenario runs, radiation is affected. Issue `https://dev.ec-earth.org/issues/621`. Not clear if this is an issue of the forcing files or from the model code. Tests will be done to find out where this bug was introduced in the trunk.
  25. - Ongoing runs: DECK at BSC (historical + control [230 years]); DMI; Lund. CNR and KNMI not started yet.
  26. - Low-res run (T159, ORCA1) (SMHI). Uses about 4 times less processors for IFS (same for NEMO). Follow issue https://dev.ec-earth.org/issues/548. Does 18 years per day.